ACTION POINTS FOR POWER DEPARTMENT
1. Total Hydle Power potential identified in the State to be kept as the target for achieving in a particular time frame and the phased programme to be planned;
2. Identifying the Solar Energy potential in the State and making a definite plan to exploit it and plan its utilization in the most optimum manner;
3. Identifying the Wind Energy potential in the State and plan its generation in a specific time frame;
4. Strengthening the ‘Transmission & Distribution’ infrastructure to reduce losses to below 15%;
5. To eliminate theft and wastage and conserve energy to add to the State revenue substantially;
6. To take effective measures in the Project catchment areas to minimize silt flow to increase project life;
7. To reduce unproductive expenditure of the Power Board;
8. To maximise revenue by proper regulation of sale & purchase of Power with other States/Entities;
9. To implement the ‘Power Reforms’ in the State immediately and get financial support form the Central Govt. to carry out infrastructural development not only in the Power Sector but also in the Social/Health/Education sectors.